Zephyr ZMIM90AG Installationsanleitung Seite 8

  • Herunterladen
  • Zu meinen Handbüchern hinzufügen
  • Drucken
  • Seite
    / 20
  • Inhaltsverzeichnis
  • FEHLERBEHEBUNG
  • LESEZEICHEN
  • Bewertet. / 5. Basierend auf Kundenbewertungen
Seitenansicht 7
Installation – Mounting Height & Clearance
6
www.zephyronline.com
DUCTING
A minimum of 6” round duct must be used to
maintain maximum air ow ef ciency.
Always use rigid type metal ducts only. Flexible
ducts could restrict air ow by up to 50%.
Use calculation worksheet to compute total duct
work (Page 5).
ALWAYS, when possible, reduce the number of
transitions and turns. If a long duct run is required,
increase duct size from 6” to 7” or 8”.
If turns or transitions are required: Install as far
away from duct opening and as far apart between
the two transitions as possible.
Minimum mount height between range top to hood
bottom should be no less than 28”.
Maximum mount height should be no higher than
36”.
It is important to install the hood at the proper
mounting height. Hoods mounted too low could
result in heat damage and re hazard; while hoods
mounted too high will be hard to reach and will
loose its performance and ef ciency.
If available, also refer to range manufacturer’s
height clearance requirements and recommended
hood mounting height above range. Always check
your local codes for any differences.
Minimum Mounting Height (Ducted)
7’7”. Hood mounted 28” above cooking surface;
64” from oor.
Minimum Mounting Height (Recirculating)
7’10”. Hood mounted 28” above cooking
surface; 64” from oor.
Maxmimum Mounting Height
10’1”. Hood mounted 36” above cooking surface;
72” from oor.
Duct cover extension kit available for ceiling
heights up to 14 feet. Turn to page 17 for part
number and ordering information.
DAMAGE-SHIPMENT / INSTALLATION:
Please fully inspect unit for damage before
installation.
If the unit is damaged in shipment, return the
unit to the store in which it was bought for
repair or replacement.
If the unit is damaged by the customer, repair
or replacement is the responsibility of the
customer.
If the unit is damaged by the installer (if other
than the customer), repair of replacement must
be made by arrangement between customer
and installer.
36”
* Min 91”
Max 121”
* The min ceiling height is 94” for recirculating option
Min. ducted 26-1/2”
Min. recirc. 30”
Max. 49”
Seitenansicht 7
1 2 3 4 5 6 7 8 9 10 11 12 13 ... 19 20

Kommentare zu diesen Handbüchern

Keine Kommentare