Zephyr AK7548ASX Installationsanleitung Seite 13

  • Herunterladen
  • Zu meinen Handbüchern hinzufügen
  • Drucken
  • Seite
    / 20
  • Inhaltsverzeichnis
  • FEHLERBEHEBUNG
  • LESEZEICHEN
  • Bewertet. / 5. Basierend auf Kundenbewertungen
Seitenansicht 12
11
CBI-600B AND PBI-1100A BLOWER INSTALLATION
1. Position blower plate over bracket on inside
back of hood and pivot up. Secure plate to hood
with (2) 10x3/16” screws. (blower pictured is a
PBI-1100A)
2. Connect male end of blower wire to female plug
in the hood. (plug is located inside the hood
behind the control panel)
3. Single Blower – Connect 6” round duct work to
blower collar.
Dual Blower – Place 10” round adapter on top of
hood and secure with (4) M4x8 screws.
Connect 10” round duct work to 10” round
adapter.
Installation – Single and Dual Internal Blowers
Seitenansicht 12
1 2 ... 8 9 10 11 12 13 14 15 16 17 18 19 20

Kommentare zu diesen Handbüchern

Keine Kommentare